SP Flex
General outfit requiring high-end technical requirements. Rebuilding the special lab required a seamless cooperation and keeping a plan precisely down to the minute. It was a great challenge for all of our divisions.
Details | |
---|---|
Size | 1 100 m2 | Location | Budapest Irinyi József utca 4-20 | Project handover | Aug 2018 | Project duration | 10 weeks |